A short, complete requirement lets the chamber, dust circuit, specimen connection and acceptance test be reviewed together.
Method
Standard, edition, IP rating or sand/dust procedure, and pass criteria
Specimen
Drawing, dimensions, mass, quantity, orientation and enclosure category
Operating state
Power, heat output, cables, signals and monitoring during exposure
Pressure & medium
Dust specification, internal free volume, extraction need and pump scope
Installation
Destination voltage, access, utilities and dust recovery requirements
Evidence
Recording, calibration, FAT demonstration and required report format