DR-H201-3 series
Uch-qavatli yuqori va past harorat portlatishga qarshi sinov kamerasi
Organize three battery-conditioning programmes in separate stacked compartments. Specify the environmental profile, powered interfaces and hazard response for each compartment before selecting the complete protection package.
DR-H201-3 series
Where the Three-Layer Design Fits
Parallel battery conditioning
Run three batches, setpoints or programmes without dedicating floor space to three separate cabinets.
Development and QC separation
Keep engineering trials, incoming inspection and routine reliability work operationally independent.
Monitored powered testing
Support test leads and specimen monitoring only after powered heat, failure modes and safety controls are engineered.
DR-H201-3 series
DR-H201 Three-Layer Model Matrix
| Model | Hajm | Internal size per compartment |
|---|---|---|
| DR-H201-80-3 | 80 L × 3 | 500 × 400 × 400 mm |
| DR-H201-100-3 | 100 L × 3 | 400 × 500 × 500 mm |
| DR-H201-150-3 | 150 L × 3 | 500 × 600 × 500 mm |
| DR-H201-225-3 | 225 L × 3 | 500 × 750 × 600 mm |
| DR-H201-408-3 | 408 L × 3 | 600 × 850 × 800 mm |
DR-H201-3 series
Environmental Performance
| Narsa | Tavsif | cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits |
|---|---|---|
| Temperature options | 0 / -20 / -40 / -70°C to +150°C | Select the required configuration per compartment. |
| Harorat birxilligi | ≤2°C, no-load | Confirm sensor map, setpoint and simultaneous operation. |
| Harorat o'zgarishi | ±0.5°C, no-load | Confirm stabilization and measurement interval. |
| Humidity option | 20% dan 98% RH gacha | Request the combined temperature-RH operating chart. |
| Humidity uniformity / fluctuation | +2/-3% RH / ±2% RH | Confirm setpoint, load and method. |
| Heating / cooling | 1–3°C/min / 0.7–1°C/min | Confirm average definition, span and loaded condition. |
| Time setting | 1–60,000 min | Confirm independent programme and record capacity. |
DR-H201-3 series
Engineer the Safety Package from the Hazard
Define the specimen
State chemistry, format, capacity, quantity, state of charge, mass, electrical energy and intended abuse or non-abuse condition.
Define credible failures
Identify gas, smoke, flame, pressure, electrolyte, fragments and heat that the chamber and facility must address.
Define detection and response
Specify sensors, thresholds, exhaust, power isolation, suppression, alarms, remote monitoring and emergency procedures.
DR-H201-3 series
Safety Functions to Confirm in the Quotation
| Function | Required confirmation |
|---|---|
| cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | Relief area, opening pressure, discharge direction and facility clearance. |
| Gas/smoke detection | Target gases, sensor range, alarm thresholds, calibration and interlock matrix. |
| Forced exhaust | Airflow, duct material, discharge point, make-up air and post-event purge. |
| Fire suppression | Agent, concentration/design basis, activation logic and local code approval. |
| Observation/video | Window rating, camera protection, recording and remote-viewing scope. |
| cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | Specimen supply cut-off, chamber shutdown, emergency stop and fail-safe state. |
| Sertifikatlash | Exact product, configuration, certificate number, scope and issuing body. |
DR-H201-3 series
Three-Layer Chamber Product View

DERUI three-layer battery climate chamber reference image. Final compartment sizes, interfaces and safety package follow the approved risk assessment and technical agreement.
DR-H201-3 series
Standards Must Be Mapped to the Exact Procedure
| Reference | cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | Boundary |
|---|---|---|
| UN 38.3 | Lithium battery transport tests | Not every T.1–T.8 procedure is performed in this climate chamber. |
| IEC 62619 | Industrial secondary lithium cell/battery safety | Confirm applicable clause, specimen and required equipment. |
| UL 1642 | Lithium cell safety evaluation | Method-specific fixtures and abuse equipment may be separate. |
| GB/T 31485 or successor/customer requirement | Battery safety test reference | Confirm current applicable document, procedure and acceptance criteria. |
DR-H201-3 series
RFQ and Safety FAT Checklist
| Topic | Information to provide or verify |
|---|---|
| cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits | Chemistry, format, capacity, SOC, quantity, mass and energy. |
| Three profiles | Temperature/RH, ramp, dwell, cycle and powered heat per layer. |
| Interfaces | Charge/discharge, measurement, gas, video, ports and data. |
| Hazards | Gas, smoke, flame, pressure, electrolyte and fragment scenarios. |
| Facility | Power, exhaust, drainage, fire system, clearance and emergency response. |
| FAT | Climate mapping, simultaneous operation, alarms, interlocks and safe-state tests. |
DR-H201-3 series
Compare the proposed equipment against the real test
Purchasing decision
Purchase the three-compartment system against a layer-by-layer schedule. Identify the specimen energy, operating state, heat load and environmental programme in every compartment. A protection item included for one application is not automatically suitable for another, and the product name alone does not establish an explosion-containment or hazardous-area certification.
Application planning
For parallel cell conditioning, define how an abnormal temperature or detector signal in one compartment affects the other two. The review should identify which electrical sources are isolated, which environmental controls stop, what alarms remain active and how exhaust is handled. State the intended normal operation and credible failure scenarios so the chamber and facility responses can be reviewed together.
Evidence to request
Request the compartment layout, protection configuration and cause-and-effect matrix. During acceptance, demonstrate the agreed sensor inputs, alarm indications and safe-state actions using an approved functional protocol. Such checks verify the controls; they are not destructive proof of containment. Any battery-event test or certification requirement needs its own defined scope and supporting documentation.
DR-H201-3 series
Choose the equipment for the intended application
Compare the equipment that matches your test scope: Ikki qatlamli harorat nazorati bilan sinov kamerası, 3000L Katta portlatishga qarshi harorat va namlik sinov kamerasi.
Request a DR-H201-3 series configuration review
Send the specimen drawing, quantity, mass, operating profile, powered heat, interfaces and destination utilities. Include the acceptance criteria and required test records so the proposed configuration can be reviewed against the actual test.
Ko'rib chiqish DERUI company information va qualification documents. Confirm which supplied documents and configuration details apply to the equipment in your quotation.
















