Xitoy, Guangdong viloyati, Dongguan shahri, Hongmei tumani, Shugang prospekti, 1-qavat, 3-raqam

20 yillik atrof-muhit sinov kamerasi ishlab chiqaruvchisiDunyo bo'ylab 3000+ mijozlarga yetkazib berishlar           Elektron pochta: shirley@deruitest.com
WhatsApp Consultation:+86 135 2795 8363

2000L Climate and Temperature Test Chamber

Aqlli tartibga solish: PID aqlli tartibga solish bilan harorat va namlikni boshqarish rejimi (BTHC)

Bir nechta himoyalar: Asosiy komponentlar barcha xalqaro brendlar import qilingan va butun tizim bir nechta himoya qurilmalari bilan jihozlangan

Yuqori birxillik: Aql bilan ishlab chiqilgan havo kanali tuzilishi, kichik harorat va namlik deviasi, yuqori birxillik va kondensatsiyani oldini olish funksiyasi

Qulay kuzatuv: Esik yoritilgan kuzatuv oynasi bilan jihozlangan bo‘lib, sinov namunasi holatini osonlik bilan kuzatish imkonini beradi

Milliy patent: ISO9001 sifat tizimi sertifikatlangan korxona, mahsulotlar milliy patentlarga ega

Xavfsiz va ishonchli
yaxshi tayyorlangan
Sifatni ta'minlash
moslashtirish
XabarWhatsApp
Hotline raqami 15580327593
  • Mahsulot tafsilotlari
  • Texnik parametrlar
  • Savollar va Javoblar
  • Biz bilan bog'laning
Custom 2 m³ Environmental Test Chamber

2000L Climate and Temperature Test Chamber for Large Test Loads

Model DR-H201-2000 provides a 2,000 L workspace for large assemblies, multiple specimens and fixtures that cannot be evaluated in a standard cabinet. DERUI configures the temperature range, humidity system, refrigeration capacity, interfaces and site utilities around the actual load and test profile.

Project basis: this is a non-standard chamber. Final performance is confirmed against the specimen envelope, mass, powered heat load, temperature-humidity profile and installation conditions—not from chamber volume alone.
ModelDR-H201-2000
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits2000 × 1000 × 1000 mm (2,000 L)
Published temperature options-20°C / -40°C / -70°C to +150°C
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limitsEngineered to the approved technical agreement

What the 2000L Workspace Changes

A larger chamber is not simply a scaled-up cabinet. Product mass, fixtures, cable routing and heat generated during operation affect airflow, pull-down, recovery and uniformity. Define the complete loaded condition before selecting refrigeration and air-handling capacity.

Loaded specimen envelope

Provide the maximum W × D × H, quantity, orientation, mass and support points. Keep clearance around the load so conditioned air can circulate.

Powered heat load

State whether specimens operate inside the chamber and provide their maximum heat dissipation. Live load can materially change achievable ramp and recovery performance.

Access and interfaces

Confirm door opening, test ports, power, thermocouples, signal cables, network connections and any fluid lines before the chamber drawing is approved.

DR-H201-2000 Published Configuration

The following values are retained from the current DERUI product record. Items not yet supported by a final project specification must be confirmed in the quotation and technical agreement.

Narsa Published value Procurement note
Model DR-H201-2000 Custom 2,000 L environmental chamber
Internal workspace 2000 × 1000 × 1000 mm Confirm dimension order as W × D × H on the approved drawing
Temperature range options -20°C / -40°C / -70°C to +150°C Select one low-temperature configuration for the project
Published heating rate 3°C/min Confirm average or linear rate, measured range, load and cooling rate
Control accuracy ±0.5°C Confirm sensor location and stabilized test condition
Harorat birxilligi ±2°C Confirm empty or loaded workspace and applicable mapping method
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits SUS304 zanglamaydigan po'latdan yasalgan Designed for durability and routine cleaning
Humidity capability Project-specific Confirm required RH range, temperature-humidity envelope and accuracy
Exterior, power and cooling Project-specific Confirm finish, supply, rated power, air/water cooling and utilities

Construction, Airflow and Control

Insulated chamber structure

The current design record identifies a SUS304 interior, high-density polyurethane foam and glass-fiber insulation, an illuminated multilayer observation window, a 50 mm cable port, casters and leveling feet.

Forced air circulation

An extended-shaft motor and stainless multi-wing fan circulate conditioned air through the workspace. Final duct design must be reviewed against the occupied volume and fixture layout.

cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits

The published configuration includes a 7-inch color interface, set/actual value display, program and segment status, curve display, timing and cycle information, and RS232/RS485 communication.

2000L DERUI Chamber Reference Image

DERUI DR-H201-2000 custom 2000L climate and temperature test chamber

Reference image of the current 2000L DERUI chamber. Final door arrangement, exterior finish, ports and utilities follow the approved project drawing.

Define Performance Before the Design Is Frozen

Talab cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits Nima uchun muhim
Test profile Temperature and RH setpoints, transitions, dwell, cycles and tolerances Determines refrigeration, heating, humidification and control capacity
Specimen load Dimensions, mass, quantity, fixtures and material Affects usable workspace, airflow and response
Operating load Maximum watts, duty cycle and internal auxiliaries Defines required heat-removal capacity
Site utilities Power, cooling water if applicable, drain, ambient condition and access Prevents installation and commissioning delays
cURL Too many subrequests by single Worker invocation. To configure this limit, refer to https://developers.cloudflare.com/workers/wrangler/configuration/#limits Empty/loaded mapping, sensor points, alarms, data and report format Creates measurable FAT and delivery criteria

How to Interpret Large-Chamber Performance

Performance figures only become meaningful when the measurement condition is defined. For a 2,000 L chamber, the technical agreement should separate chamber-air capability from the response of the actual specimen.

Air temperature vs specimen temperature

The controller measures chamber air at a defined sensor location. A dense or insulated specimen may reach the target later, so product temperature should be monitored separately when it governs the test.

Empty vs loaded performance

Uniformity, ramp rate and recovery measured in an empty chamber do not automatically describe a fully occupied workspace. State the load mass, placement and powered heat output for any loaded guarantee.

Average vs linear ramp rate

An average rate is calculated across a defined temperature interval; a linear rate limits the slope throughout that interval. The quotation should name the method, start/end temperatures and allowable tolerance.

Stabilization and dwell

A programmed dwell begins at the controller setpoint unless the procedure states otherwise. For large assemblies, define whether dwell starts after chamber air or designated specimen sensors stabilize.

Door-opening recovery

Recovery depends on door-open time, ambient conditions, load and operating heat. If access during testing is required, include the opening sequence and recovery target in the project specification.

Humidity operating envelope

Relative-humidity capability changes with temperature. Specify combined temperature-RH points rather than separate headline ranges so the humidification and dehumidification system can be sized correctly.

Where This 2000L Chamber Fits—and Where It Does Not

Suitable project direction

Large assemblies, batch-loaded components, cabinets, modules and fixtures that require programmed temperature or temperature-humidity exposure within a 2 m³ workspace.

Powered functional testing

Possible when power, signal and monitoring interfaces are defined in advance and the specimen heat output is included in the refrigeration calculation.

Do not assume equivalence

This configuration should not be treated automatically as a issiq-shok kamerasi, altitude chamber, vibration system or hazardous battery-abuse enclosure. Those exposures require dedicated engineering and safety review.

Selection rule: choose this chamber when usable workspace and controlled climatic exposure are the primary requirements. If rapid transfer, pressure reduction, vibration coupling or deliberate abuse is part of the method, review a purpose-built system instead.

Recommended FAT for a Custom 2000L Chamber

Agree the acceptance method before manufacturing so the delivered system is judged against measurable project requirements rather than catalogue wording.

FAT item What to verify Acceptance basis
Drawing and construction review Internal clear space, door access, shelves/fixtures, ports, drainage, utilities and service clearance Approved general-arrangement drawing and bill of materials
Temperature mapping Specified sensor positions, setpoints, stabilization, deviation, fluctuation and uniformity Values and method stated in the technical agreement
Humidity mapping, if configured Agreed temperature-RH points, stabilization and recorded deviation Approved combined operating points—not separate maximum ranges
Ramp and recovery Defined start/end points, average or linear method, empty/loaded condition and specimen heat Project-specific guaranteed condition
Controls and safety Programs, alarms, interlocks, sensor faults, communications and data records included in the order Approved functional checklist
Delivery records FAT report, calibration or verification records, manuals, electrical drawings and packing list Contract document schedule

Factory Configuration and Project Options

The published delivery list includes a qualification certificate, user manual, electrical schematic, two specimen trays and eight support hooks. Final quantities, tray loading and documentation must follow the approved bill of materials.

Confirm separately: humidity range, exterior dimensions and finish, cooling method, electrical supply, rated power, cooling rate, loaded performance, allowable heat load, port quantity, USB/LAN functions, calibration scope and third-party certification.

Ko‘p so‘raladigan savollar

Is this a standard 2000L chamber?

No. DR-H201-2000 is presented as a custom large-capacity chamber. The final refrigeration, humidity, interfaces and utilities are selected from the approved test requirement.

Does 2000L guarantee enough usable space?

No. Confirm the loaded envelope, fixture, airflow clearance, cable bend radius and door access. Nominal volume alone does not confirm fit or uniformity.

Can the chamber control humidity?

The current product record describes temperature-humidity control, but it does not publish a complete RH range. The required humidity envelope and accuracy must therefore be confirmed in the quotation.

Is 3°C/min guaranteed with the customer load?

Not from the current published information. Define whether the rate is average or linear, the measured range, specimen mass and operating heat load before stating a guarantee.

What should be included in FAT?

Agree temperature and humidity points, sensor layout, empty or loaded condition, stabilization, uniformity, deviation, alarms, communications, data export and report format before manufacture.

Configure the 2000L Chamber from the Actual Load

Send the test standard, specimen dimensions and mass, fixture layout, powered heat load, temperature-humidity profile, required transition rates, site utilities and FAT criteria. DERUI can review the configuration before preparing the technical proposal.

Request a 2000L Chamber ReviewDownload Equipment Information

FacebookLinkedInXRedditWhatsApp
Kategoriya​ ​​Texnik xususiyat​​
Brend Derui
Model DR-H201-2000
Turi Atrof-muhit sinov kamerasi
Tashqi Material Elektrostatik püskürtme po'lat
Ichki Material 304 zanglamaydigan po'lat
Kamera o'lchamlari 2000×1000×1000mm
Harorat diapazoni -20~150℃、-40~150℃、-70~150℃
Harorat o'zgarishi ±2℃
Harorat birxilligi ±2℃
Isitish tezligi 3℃/min
Boshqarish aniqligi ±0.5℃
Ko'rsatish aniqligi ±0.01℃
Haroratni boshqarish Sovuq muvozanat
Moslashtirish Ha
Vazn 800kg
Tavsif Moslashtiriladigan
Chegara tashqarisi ta'minoti Ha

1, Klimat harorat sinov kamerasi qanday muhit sharoitlarini sinovdan o'tkazishi mumkin?
Klimat harorat sinov kamerasi yuqori harorat, yuqori namlik, past harorat va past namlik kabi turli muhit sharoitlarini sinovdan o'tkazishi mumkin va turli mahsulotlarning iqlim sharoitlarini tekshirish uchun mos keladi.

2, To'g'ri klimat harorat sinov kamerasi qanday tanlanadi?
To'g'ri klimat harorat sinov kamerasi tanlash uchun sinov talablari, harorat diapazoni va namlikni boshqarish ehtiyojlariga asoslangan baholash talab etiladi.

3, Biz klimat sinov kameralarini moslashtira olamizmi?
Ha, biz klimat harorat sinov kameralarini mijozlarning aniq ehtiyojlariga moslashtirish uchun xizmatlar taklif qilamiz.

4, Klimat sinov kameraning quvvat sarfi qancha?
Klimat harorat sinov kameraning quvvat sarfi model va foydalanishga qarab o'zgaradi. Siz aniq modelga asoslangan batafsil ma'lumotlarni tekshirishingiz mumkin.

5, Sinov kameraning samaradorligini qanday oshirish mumkin?
Sinov parametrlarini oqilona sozlash va muntazam texnik xizmat ko'rsatish klimat sinov kameraning sinov samaradorligini sezilarli darajada oshirishi mumkin.

6, Klima sinov kamerasi uchun texnik xizmat ko‘rsatish chastotasi nima?
Umuman olganda, klima sinov kamerasi eng yaxshi ishlash holatini va unumdorligini saqlash uchun yiliga bir marta keng qamrovli texnik xizmat ko‘rsatishni tavsiya etiladi.

WhatsAppWhatsApp
WhatsAppWhatsApp
WhatsApp
XabarXabar

Taklif so'rang